Lift System Parts
Goshen Master Tube
SKU: PA-GOSHMASTERTUBE
$84.00
Part details
Master Tube for Goshen Lift Systems
This is the replacement Master Tube, the central hub of the Goshen lift system. This heavy-duty tube is the core component that the main lift cable acts upon. The four flexible pusher springs, which run to each corner of the camper, connect to this master tube, allowing it to distribute the lifting force evenly and simultaneously to all four corners of the roof.
A damaged or broken master tube is a critical failure that can disable your entire lift system. If the connection points for the spring tubes are broken, or if the tube itself is bent or rusted through, it must be replaced to restore safe and reliable operation. This part is essential for ensuring a balanced and synchronized lift.
Key Features:
- Central Distribution Hub: The main component that activates all four corner spring assemblies.
- Ensures Balanced Lifting: Distributes force evenly for a smooth, synchronized lift.
- Heavy-Duty Steel Construction: Built for maximum strength and durability.
- Direct Replacement: A factory-spec part for campers equipped with the Goshen lift system.
Common Master Tube Sizes (reference only)
Goshen master tubes are commonly available in two lengths. Select the length that matches your existing tube.
| Length | Notes |
|---|---|
| 52" | One of the two standard Goshen master tube lengths. |
| 55" | Alternate standard length; affects replacement main-cable length. |
Measurement tip: Confirm the length of your existing master tube before ordering. Master tube length directly impacts the correct main-cable length for your camper.
For Campers Using the Goshen System:
This system is used on a wide variety of pop-up campers. While this part is a direct replacement for the Goshen system, it is commonly found on brands such as:
- Skamper
- Palomino
- Steury
- Dutchmen
- And many others.
Service Notes: Goshen Master Tube
Safety: Support the roof securely before servicing any lift component, and level the camper before operating.
- Grease both chambers annually: use chassis grease via each zerk until clean grease exits the chamber ends (typically ~14 oz per chamber). Front = lower chamber, rear = upper.
- Master Tube length affects the replacement main-cable length: 52" fits 3-stage posts, 55" fits 4-stage low-profile. Measure carefully before ordering.
Full guide with diagrams, maintenance tips, and troubleshooting: Goshen Lift System Guide.
Listed fitments (1)
Check your model, lift system and cable position against these listings and the part details.
